East London Distribution Hub

Enabling works and drainage package for a 120,000 sq ft logistics facility in East London, delivered on programme ahead of main build.

Project Overview

Inhire was appointed to deliver the groundworks and drainage package for a new distribution hub on a former industrial site in Dagenham. The works formed the enabling phase of a larger commercial development and required close coordination with the main contractor's programme.

Scope of Works

  • Site clearance and bulk excavation of 18,000 m³
  • Below-ground drainage and attenuation system
  • Reinforced concrete foundations and slab preparation
  • Sub-base construction and hardstanding formation

Project Challenges

The site presented variable ground conditions and limited access due to adjacent operational units. Works also needed to progress around existing statutory services and a live site entrance.

Our Solution

We staged the programme to prioritise drainage runs and service diversions, then sequenced excavation and concrete packages to maintain access and avoid rework. A dedicated site supervisor coordinated daily with the main contractor.

Results

The groundworks and drainage package was completed two weeks ahead of schedule, allowing the steel frame contractor to commence on the agreed date.

Gallery

[ADD PROJECT IMAGE]
[ADD PROJECT IMAGE]
[ADD PROJECT IMAGE]

More Projects

Explore further project references

View All Projects

Inhire Ltd • Commercial Services

Discuss your project requirements with Inhire

Send us your scope, drawings or workforce requirements and our team will review your enquiry.