What You Need To Know Before Starting A Rear Extension

Starting a rear extension project is an exciting step towards transforming your home, giving you much-needed extra space and potentially adding significant value. However, it’s a major undertaking that requires careful planning and research. Before you dive into blueprints and builders, here is everything you need to know, presented in good old British English.


1. 📋 Planning Permission vs. Permitted Development

The very first hurdle you need to clear is determining whether your proposed extension requires a full Planning Permission application or if it falls under Permitted Development (PD) rights.

  • Permitted Development: Many smaller, single-storey rear extensions can be built without a formal application, provided they adhere to strict limits on size, height, and proximity to boundaries.

    • Limits: Typically, single-storey rear extensions cannot extend further than 3 metres from the original rear wall for a terraced or semi-detached house, or 4 metres for a detached house.

    • Key Point: Even if your extension is PD, it’s highly recommended to apply for a Lawful Development Certificate from your local council. This proves the work was legal when completed, which is crucial when you eventually come to sell the property.

  • Planning Permission: You will definitely need this if your extension exceeds the PD limits, is on the side of the house, is two storeys, or if your property is in a designated area like a Conservation Area, a National Park, or is a Listed Building.

Note: Rules are slightly different in Wales, Scotland, and Northern Ireland, so always check the specific guidance for your region.


2. 🧱 Building Regulations Approval

Crucially, Permitted Development does not exempt you from Building Regulations. This is a separate, non-negotiable legal requirement that ensures your extension is structurally sound, safe, energy efficient, and meets fire safety standards.

  • What it Covers: Foundations, damp-proofing, wall structure, roof integrity, ventilation, electrical wiring, and drainage.

  • The Process: You can submit a Full Plans Application (recommended) or a Building Notice. A Building Control Officer will inspect the work at various stages (e.g., when the foundations are dug, before plastering, and upon completion).

  • Sign-Off: You will receive a Final Certificate upon successful completion, which is another document your solicitor will request when you sell the property.


3. 🏡 The Party Wall Act 1996

If your extension involves building on or near a boundary wall shared with a neighbour (a Party Wall), you must adhere to the Party Wall Act 1996. This is often the trickiest part of the process.

  • The Trigger: The Act is usually triggered if you are:

    • Building astride the boundary line.

    • Excavating foundations within 3 metres of your neighbour’s structure and deeper than their foundations.

    • Cutting into a shared wall (e.g., to insert a steel beam).

  • The Process: You must serve a formal Party Wall Notice to affected neighbours, giving them a statutory notice period (usually one or two months).

    • If they consent: The work can proceed.

    • If they dissent (or don’t reply): You will need to appoint a Party Wall Surveyor (or two, if they wish to appoint their own) to draw up a Party Wall Award. This document sets out how the work should proceed, when, and includes a Schedule of Condition for the neighbour’s property to record its state before the work begins.


4. 💰 Budgeting and Financial Planning

Be realistic about the costs. A good rule of thumb is to factor in a 10-15% contingency on top of your quotes, as unforeseen issues (like digging up unexpected drain runs or finding poor ground conditions) almost always arise.

Cost Component Description
Design Fees Architect, Structural Engineer, Surveyors.
Construction Costs The builder’s quote for labour and materials.
Statutory Fees Planning Permission application, Building Control fees.
Party Wall Costs Surveyor fees (potentially for two surveyors).
Finishes & Fittings Kitchen/bathroom units, flooring, painting, lighting.
VAT Currently 20% on most construction services.
  • Quotes: Always get at least three detailed, itemised quotes from reputable builders. Ask to see examples of their previous work and speak to past clients.


5. 🏗️ The Build Team

The success of your project hinges on the quality of your build team.

  • Architect/Architectural Designer: Essential for drawing up plans, managing the planning application, and advising on design.

  • Structural Engineer: Crucial for calculating and designing the steel beams (RSJs) and foundations that will hold up your new structure and any altered existing walls.

  • Builder/Main Contractor: The company that manages the day-to-day construction. Ensure they have appropriate Public Liability Insurance.


6. 💡 Design Considerations

Think beyond just the footprint. How will the new space connect to the old?

  • Light: Rear extensions, especially large ones, can make the original part of the house dark. Consider roof lights (Velux windows), large sliding or bi-fold doors, and strategically placed windows to maximise natural light.

  • Heating and Insulation: The extension must meet current insulation standards. Think about underfloor heating, which is highly efficient and eliminates the need for radiators.

  • Drainage: You may need to divert or protect existing manholes and drainage runs that fall within the extension footprint. This is often an extra cost and requires water authority approval.


✅ Your Next Steps

Before picking up the phone to a builder, start with the planning.

  1. Check PD Rights: Use the government’s online planning portal or your local council’s website to check the constraints for your area.

  2. Speak to an Architect: Get professional design advice and a preliminary idea of the feasibility and cost.

  3. Talk to Neighbours: While not legally required yet, having a friendly conversation with neighbours early on can prevent future disputes, particularly regarding Party Walls.