1. Define Your Scope (The ‘Must-Haves’ vs. ‘Nice-to-Haves’)
The primary cause of budget overruns is “scope creep”—the tendency to add small extras that accumulate into thousands of pounds.
-
Create a Master List: Write down every single element of the project. If you are renovating a bathroom, this includes everything from the bathtub and tiles down to the toilet roll holder and grout.
-
Prioritise: Categorise items into “Essentials” (structural integrity, heating, basic fixtures) and “Luxuries” (high-end brassware, smart lighting). If the quotes come in high, you’ll know exactly what to cut first.
2. Get Accurate Labour Quotes
Labour usually accounts for 50% to 60% of a renovation budget in the UK.
-
The Rule of Three: Always get at least three detailed quotes from reputable builders. Ensure they are quoting for the exact same scope so you can compare like-for-like.
-
Check for VAT: Always ask if a quote includes VAT (currently 20%). A £10,000 quote that hasn’t accounted for VAT is actually a £12,000 quote—a significant jump if you haven’t prepared for it.
-
Day Rates vs. Fixed Price: For large projects, a fixed-price contract is usually safer. Day rates can be risky if the project hits unexpected delays.
3. Account for Professional Fees and Permissions
The cost of the physical build is only one part of the equation. In the UK, professional fees can add significantly to your total spend.
| Fee Type | Estimated Cost (UK Average) | Why You Need It |
| Architect | 7% – 15% of build cost | Design, planning, and technical drawings. |
| Structural Engineer | £500 – £2,000 | Essential for removing walls or extensions. |
| Building Control | £300 – £1,000 | Council fees to ensure work meets safety standards. |
| Party Wall Surveyor | £1,000+ per neighbour | Required if working on shared boundaries. |
| Skip Hire | £250 – £450 per skip | For waste removal throughout the project. |
4. The Golden Rule: The 10-20% Contingency
If there is one thing that defines a “realistic” budget, it is the contingency fund. This is money set aside specifically for the “unknown unknowns.”
In older British properties, you might uncover damp, faulty wiring, or shallow foundations once the work begins.
-
Standard Project: Set aside 10% of your total budget.
-
Major Renovation/Period Property: Set aside 15-20%.
-
Note: This is not extra money for a better kitchen; it is a safety net to ensure the project actually gets finished.
5. Don’t Forget the “Hidden” Living Costs
A budget often fails because it focuses solely on the house and forgets the humans living in it.
-
Temporary Living: If you have to move out, account for short-term rent or storage fees.
-
The “Takeaway Tax”: If your kitchen is out of action for three weeks, your food bill will skyrocket. Budget for eating out or convenience meals.
-
Parking Permits: If you live in a restricted parking zone, you may need to pay for tradesmen’s parking permits or bay suspensions.
6. Sourcing Materials Wisely
While your builder will likely source structural materials (bricks, timber, plaster), you may be responsible for “PC Sums” (Prime Cost) like kitchens, flooring, and tiles.
-
Shop Around: Use trade accounts where possible, but don’t ignore seasonal sales at major UK retailers like Wickes, B&Q, or specialist tile outlets.
-
Lead Times: Ordering late can cost money. If a bespoke window doesn’t arrive on time, you may still have to pay the daily rate for builders who have no work to do.



